Add-on

PDM

Version control for everything engineering releases

Manage CAD, firmware and document revisions with check-in/check-out, engineering change notices and impact analysis.

ตามคำขอ
มีจำหน่ายสำหรับProAdvancedEnterprise
PDM shown as a schematic isometric scene

What you get

  • Versioning for CAD, firmware and documents
  • Check-in / check-out and revision control
  • Engineering Change Notices (ECN)
  • BOM revisions with approval flow
  • Impact analysis on stock, WIP and orders
  • CAD connectors

มันทำงานอย่างไร

PDM, ทีละขั้นตอน

บ้านควบคุมหลังเดียวสำหรับเขียนแบบ ข้อมูลจำเพาะ และการแก้ไข

Capture documents

Drawings, CAD exports and specs are attached to items and operations instead of living in shared folders.

Control revisions

Every change gets a revision, an author and an approval trail; superseded files stay readable but clearly retired.

Publish to the floor

Operators always open the current revision from the work order — no printed copies to go stale.

ดู PDM ทำงานบนกระบวนการของคุณเอง

จองเซสชั่น 30 นาที เราจะอธิบายขั้นตอนเหล่านี้พร้อมกับข้อมูลของคุณและแจ้งประมาณการการเปิดตัวให้กับคุณ PDM.

ความสามารถ

ทุกอย่างใน PDM

    Versioning for CAD, firmware and documents
    Check-in / check-out and revision control
    Engineering Change Notices (ECN)
    BOM revisions with approval flow
    Impact analysis on stock, WIP and orders
    CAD connectors
    Check-in / check-out with immutable revision history
    Engineering Change Notices with review and approval flow
    Impact analysis against BOMs, open orders, stock and WIP
    CAD connectors keep design tools and production data in step
    One released version visible to engineering, planning and the shop floor

The engineering source of truth

PDM keeps every technical artefact — CAD models, drawings, firmware, PDFs — under versioning with check-in / check-out, so nobody manufactures from an outdated file.

Engineering change under control

Engineering Change Notices (ECN) drive BOM revisions through a controlled approval flow. Before a change is released, impact analysis shows exactly what it hits: current stock, work in progress, open purchase orders and released production orders.

Connected, not isolated

CAD connectors (e.g. SolidWorks) push revisions into the same loop production and purchasing already work in.

Every engineering artefact — CAD models and drawings, firmware, test protocols and PDFs — lives under check-in/check-out with a revision history that cannot be quietly overwritten. Engineering Change Notices carry the change through review and approval, and impact analysis shows what the change touches before it is released: which BOMs, which open manufacturing orders, which stock on hand and which work in progress. CAD connectors keep the design tool and the system in step, so the shop floor never works from a superseded drawing.

คำถามที่พบบ่อย

PDM — คำถามที่พบบ่อย

คำตอบสั้น ๆ สำหรับคำถามที่ทีมงานถามก่อนเปิดใช้งานโมดูลนี้.

ดู PDM ทำงานกับข้อมูลของคุณ