Add-on

WMS

Warehouse execution from the gate to the shipped truck

Full warehouse management: yard, receiving, handling units, traceability, replenishment, waves, picking, packing and shipping.

درخواست پر
کے لیے دستیاب ہے۔ProAdvancedEnterprise
WMS shown as a schematic isometric scene

What you get

  • Yard and gate control with doors and dock sessions
  • ASN/PO receiving, quick receipt, returns, GRN and putaway
  • Handling units, splits, merges, batch genealogy, traceability
  • Stock explorer, transfers, adjustments, holds
  • Min/max replenishment and cycle counting
  • Waves, picking, packing, shipping and deliveries

یہ کیسے کام کرتا ہے۔

WMS, قدم بہ قدم

وصول کرنے سے لے کر شپنگ تک - ہر حرکت کو اسکین، واقع اور ٹریس ایبل کیا جاتا ہے۔

Receive and put away

Inbound deliveries are matched to purchase orders, labelled and routed to a storage location suggested by the system.

Track every location

Bins, racks and shop-floor buffers are mapped one-to-one with stock records, so quantities always reflect physical reality.

Pick, pack, ship

Pick lists are generated from orders and production demand; scanning confirms each line before dispatch.

Measure and correct

Cycle counts, movement history and accuracy reports show where losses happen and how to close them.

WMS کو اپنے عمل پر چلتا دیکھیں

30 منٹ کا سیشن بُک کریں — ہم آپ کے ڈیٹا کے ساتھ ان مراحل پر چلتے ہیں اور آپ کو رول آؤٹ کا تخمینہ دیتے ہیں WMS.

صلاحیتیں

WMS میں سب کچھ

    Yard and gate control with doors and dock sessions
    ASN/PO receiving, quick receipt, returns, GRN and putaway
    Handling units, splits, merges, batch genealogy, traceability
    Stock explorer, transfers, adjustments, holds
    Min/max replenishment and cycle counting
    Waves, picking, packing, shipping and deliveries
    Operator terminals and role workspaces
    Productivity, dock and accuracy reports
    Structure, labels, policies, integrations and webhooks

The warehouse as an execution layer

Stock levels in an ERP tell you what you own. WMS tells you where it physically is, who touched it and what happens next.

Inbound

Yard and gate control with doors, dock sessions and exceptions. Receiving by ASN/PO, unloading, quick and direct receipt, production receipts and customer returns, GRN posting and a putaway monitor.

Inventory

Handling units with splits and merges, batch genealogy and full traceability. Stock explorer, transfers, adjustments, holds, min/max replenishment and cycle counting plans.

Outbound

Waves, picking, packing, shipping, deliveries and vendor returns — with operator terminal screens for receive, putaway and pick, plus manager and storekeeper workspaces.

Control

Reports on pick productivity, workload heatmap, dock utilisation, receiving accuracy, exceptions and turnover. Administration of warehouse structure, work centres, labels, policies, counterparties, users, integrations and outbound webhooks.

ایڈیشنز

WMS editions

اپنی مطلوبہ تفصیل کی سطح کے مطابق ایڈیشن منتخب کریں۔

Starter

Single warehouse, core receiving and shipping

درخواست پر

  • Warehouse structure
  • Receiving by document
  • Putaway
  • Stock explorer
  • Picking and shipping

Standard

Handling units, replenishment and counting

درخواست پر

  • Everything in Starter
  • Handling units
  • Transfers and adjustments
  • Min/max replenishment
  • Cycle counting
  • Core reports

Professional

Yard control, waves and full traceability

درخواست پر

  • Everything in Standard
  • Yard, gate and dock sessions
  • Waves and packing
  • Batch genealogy and traceability
  • Holds and quality checks
  • Operator terminals

Advanced

Multi-warehouse, integrations and webhooks

درخواست پر

  • Everything in Professional
  • Multi-warehouse
  • Integrations and outbound webhooks
  • Custom labels and policies
  • Advanced analytics
  • Priority support

اکثر پوچھے گئے سوالات

WMS — اکثر پوچھے گئے سوالات

اس ماڈیول کو فعال کرنے سے پہلے ٹیموں کے سوالات کے مختصر جوابات۔

اپنے ڈیٹا پر WMS کو کام کرتے ہوئے دیکھیں