Add-on

Services

Repair, modification, installation and scheduled maintenance

Service management for repair and maintenance work: defectation, service orders, brigades, kiosks and material requirements.

درخواست پر
کے لیے دستیاب ہے۔ProAdvancedEnterprise
Services shown as a schematic isometric scene

What you get

  • Service objects and versioned service models
  • Incoming inspection, defectation and defect acts
  • Service order lifecycle with rework loop
  • Routing templates and service types
  • Workers, brigades and qualifications
  • Kiosk modes for worker, inspector, supervisor

یہ کیسے کام کرتا ہے۔

Services, قدم بہ قدم

فیلڈ سروس، تنصیب اور دیکھ بھال کا انتظام اسی پلیٹ فارم پر ہوتا ہے جہاں پروڈکشن ہوتا ہے۔

Register the request

Service calls, warranty claims and planned maintenance arrive in one queue with equipment history attached.

Schedule the crew

Technicians, skills, spare parts and travel are planned together so a visit is not wasted.

Execute on site

Checklists, consumed parts and photos are captured in the field and synced back to the order.

Bill and analyse

Time and materials convert into invoices; recurring failures feed back into engineering.

Services کو اپنے عمل پر چلتا دیکھیں

30 منٹ کا سیشن بُک کریں — ہم آپ کے ڈیٹا کے ساتھ ان مراحل پر چلتے ہیں اور آپ کو رول آؤٹ کا تخمینہ دیتے ہیں Services.

صلاحیتیں

Services میں سب کچھ

    Service objects and versioned service models
    Incoming inspection, defectation and defect acts
    Service order lifecycle with rework loop
    Routing templates and service types
    Workers, brigades and qualifications
    Kiosk modes for worker, inspector, supervisor
    Material, procurement and production requests
    Work centres, capacity planning and audit trail

Service work has its own logic

Repairing or modifying an object is not a production order. The scope is only known after inspection, and it changes as work goes on. This add-on models that properly.

From inspection to closed order

Service orders run from incoming inspection through preliminary and detailed defectation, defect acts, execution and quality review — with a rework loop when quality is not accepted.

Object models that stay clean

Service objects use versioned models with a work tree. Creating an order deep-copies the tree, so adjusting one order never mutates the master model.

Shop floor and supply

Tasks are assigned to workers and brigades by qualification, executed through kiosk screens for worker, inspector and supervisor. Material requirements raise procurement and production requests toward warehouses. Work centres, locations and capacity planning keep the load realistic, with a full audit trail and printable documents.

اکثر پوچھے گئے سوالات

Services — اکثر پوچھے گئے سوالات

اس ماڈیول کو فعال کرنے سے پہلے ٹیموں کے سوالات کے مختصر جوابات۔

اپنے ڈیٹا پر Services کو کام کرتے ہوئے دیکھیں