Add-ons
Extend your plan with independent modules
Each add-on is a product in its own right — attach the ones your operation needs, pay only for those.
Sales & Operations Planning (S&OP)
One consensus plan across demand, supply, capacity and finance
Balance demand, supply and capacity on a rolling horizon — including seasonal peaks, expiry dates, remote warehouses and market-specific SKUs — and turn the agreed plan into scheduling input.
- Rolling demand and supply horizon
- Capacity vs. demand balancing
- Scenario planning and comparison
- Consensus plan published to scheduling
- Plan vs. actual tracking
- Demand and supply balanced on one horizon
How it works
- Build the demand picture
- Test it against capacity
- Agree one plan
CRM
From contact to signed deal and invoice — with cable economics inside
Sales management built for manufacturers: pipelines, quotes and invoices with LME-linked cost and gross-margin control.
- Contacts, organisations and activity timeline
- Opportunity → lead → deal pipelines
- Quotes, contracts, proformas, invoices with PDF output
- Price lists with gross-margin control
- Material structure, LME-linked cost base, packaging economics
- Projects, tenders and delivery schedule
How it works
- Capture the lead
- Quote from real data
- Convert to orders
CablePLM
Standards-driven cable design that rolls straight into cost
Design cable constructions to standards, generate cross-sections, and roll materials and cost directly into the BOM.
- Standards-driven cable design
- 2D / 3D cross-sections
- Material and cost roll-up into BOM
- Revision control
- Hand-off to production
- Layer-by-layer construction: conductor, insulation, screen, armour, sheath
How it works
- Model the construction
- Generate BOM and routing
- Cost and quote instantly
PDM
Version control for everything engineering releases
Manage CAD, firmware and document revisions with check-in/check-out, engineering change notices and impact analysis.
- Versioning for CAD, firmware and documents
- Check-in / check-out and revision control
- Engineering Change Notices (ECN)
- BOM revisions with approval flow
- Impact analysis on stock, WIP and orders
- CAD connectors
How it works
- Capture documents
- Control revisions
- Publish to the floor
AI Agents (Co-Pilot)
Anticipates bottlenecks, suggests the fix, you decide
AI co-pilot for planning, inventory and scheduling: recommendations and scenario simulations with human-in-the-loop approvals.
- Bottleneck anticipation
- Inventory analysis and coverage advice
- Scheduling recommendations
- Scenario simulation
- Natural-language system overview
- Human-in-the-loop approvals
How it works
- Connect to live data
- Detect and explain
- Propose the next action
Project Management
For project-based and engineer-to-order manufacturing
Run projects end to end: BOQ, Gantt with critical path, resources, costs, change orders and installation.
- Portfolio dashboard: schedule, cost, margin
- BOQ driving budget and scope
- Gantt with dependencies, critical path and baselines
- Resource planning and loading
- Cost tracking vs. budget and change orders
- Linked sales, material and manufacturing orders
How it works
- Structure the project
- Plan the work
- Track time and cost
Services
Repair, modification, installation and scheduled maintenance
Service management for repair and maintenance work: defectation, service orders, brigades, kiosks and material requirements.
- Service objects and versioned service models
- Incoming inspection, defectation and defect acts
- Service order lifecycle with rework loop
- Routing templates and service types
- Workers, brigades and qualifications
- Kiosk modes for worker, inspector, supervisor
How it works
- Register the request
- Schedule the crew
- Execute on site
WMS
Warehouse execution from the gate to the shipped truck
Full warehouse management: yard, receiving, handling units, traceability, replenishment, waves, picking, packing and shipping.
- Yard and gate control with doors and dock sessions
- ASN/PO receiving, quick receipt, returns, GRN and putaway
- Handling units, splits, merges, batch genealogy, traceability
- Stock explorer, transfers, adjustments, holds
- Min/max replenishment and cycle counting
- Waves, picking, packing, shipping and deliveries
How it works
- Receive and put away
- Track every location
- Pick, pack, ship
Add-ons pay for themselves — start with the one that hurts most
Tell us where production hurts today. In one live session we show which add-on pays off first and how it plugs into the modules you already run.
- Live walkthrough of the add-ons you care about
- Per-user cost estimate for your team
- Integration plan with your current systems