Add-on

CablePLM

Standards-driven cable design that rolls straight into cost

Design cable constructions to standards, generate cross-sections, and roll materials and cost directly into the BOM.

CablePLMwww.cableplm.com
On request
Available forProAdvancedEnterprise
CablePLM shown as a schematic isometric scene

What you get

  • Standards-driven cable design
  • 2D / 3D cross-sections
  • Material and cost roll-up into BOM
  • Revision control
  • Hand-off to production
  • Layer-by-layer construction: conductor, insulation, screen, armour, sheath

How it works

CablePLM, step by step

Turn cable and harness engineering into reusable, cost-aware product data.

Model the construction

Describe conductors, insulation, screens and sheaths once — the structure becomes a versioned product definition.

Generate BOM and routing

Materials, weights and process steps are calculated from the construction instead of retyped in spreadsheets.

Cost and quote instantly

Copper, polymer and labour rates flow into the cost model, so a quote reflects today's prices, not last quarter's.

Release to production

Approved revisions are pushed to production orders and technical data with a full change history.

See CablePLM running on your own process

Book a 30-minute session — we walk these steps through with your data and give you a rollout estimate for CablePLM.

Capabilities

Everything inside CablePLM

    Standards-driven cable design
    2D / 3D cross-sections
    Material and cost roll-up into BOM
    Revision control
    Hand-off to production
    Layer-by-layer construction: conductor, insulation, screen, armour, sheath
    2D cross-section and 3D preview generated from the configuration
    Consumption norms and tolerances per layer feed the BOM automatically
    LME-linked metal cost base for instant re-quoting
    Design revisions handed over to production under version control

Design that already knows the cost

CablePLM keeps the cable construction, its standards compliance and its economics in one model. Every layer you add is a material, a weight and a cost — not just a drawing.

What it does

  • Standards-driven construction of cable designs
  • 2D and 3D cross-section generation
  • Material and cost roll-up into the BOM
  • Revision control over constructions
  • Clean hand-off of the approved revision to production

Design is driven by standards and material data, not by redrawing: conductor, insulation, screen, armour and sheath are configured layer by layer, each with its own material, tolerance and consumption norm. The 2D cross-section and 3D preview update as you configure, and the resulting structure becomes a real BOM with routing and cost — so a quotation reflects the cable you would actually manufacture. Metal content is priced against the current LME base, so re-quoting after a price move is a recalculation rather than a project.

FAQ

CablePLM — frequent questions

Short answers to what teams ask before switching this module on.

See CablePLM running on your data