Jobshop & Custom Production

Extreme variability — optimize schedules and enforce execution discipline with trusted feedback.

Jobshop and custom production environments are defined by extreme variability: changing routings, urgent priorities, limited skilled resources, and daily constraint shifts. factory.online helps jobshops deliver on time, improve profitability, and scale output by optimizing schedules and enforcing execution discipline with trusted feedback.

Specific challenges in jobshops:

  • High-mix, low-volume complexity: unique routings and frequent engineering changes.
  • Constant priority changes: expediting breaks plans; promised dates become unreliable.
  • Setup family constraints: sequence-dependent setups, tooling limits, and changeover penalties.
  • Skill-based dispatching: few key operators become hidden bottlenecks.
  • Material readiness: missing components create stop-start production.
  • WIP explosion: too many open orders create long queues and slow flow.
  • Quoting vs capacity reality: delivery promises not aligned with real constraints.
  • Subcontract operations: external steps add uncertainty and hidden lead time.
  • Manual scheduling: spreadsheets cannot optimize under real constraints.

What factory.online delivers:

  • Every quote is a guess → quoting on real routings and standard costs, then compared with actual cost after the job to fix the next estimate.
  • Urgent orders wreck the whole schedule → APS reschedules in minutes and shows the delivery impact of every priority change before you accept it.
  • Skilled operators are the real constraint → work centres, shifts and skill levels are planned as finite resources, not as unlimited capacity.
  • Customers call to ask where their order is → real-time order progress per operation, visible to sales without walking to the shop floor.
  • Overtime and expediting quietly kill profit → actual costing per job exposes rework, waiting and overtime so you can price or eliminate them.

Pain → solution

Solutions by industry: Jobshop & Custom Production

Each module and add-on below is mapped to a concrete problem on your shop floor.

SalesModule

Every quote is a guess and the cheap jobs turn out to be the loss-makers.

Quotes are built from real routings and standard costs, then compared with actual cost after delivery.

One urgent order wrecks the whole week of planning.

APS reschedules in minutes and shows the delivery impact of a priority change before you accept it.

Multi-stage custom orders need coordination that production orders alone cannot express.

Project Management links engineering, procurement and production stages into one deliverable timeline.

Overtime, rework and expediting quietly destroy profit on custom jobs.

Actual costing per job exposes waiting, rework and overtime so they can be priced or eliminated.

Use cases

Use cases for jobshops & custom production

Concrete scenarios our customers automate first — from the quote to the shipped pallet.

Estimate a one-off job fast

Reuse similar past jobs to price a new enquiry with real cost data instead of gut feeling.

  • Estimate from history
  • Cost build-up
  • Quote versions
CRM add-on →

Engineer-to-order routing

Create BOM and route while the job runs, with changes tracked instead of shouted across the shop.

  • On-the-fly BOM
  • Change history
  • Progress per operation
Project Management add-on →

Shop-floor time and material capture

Operators book time and material at the terminal, so job cost is current, not month-end news.

  • Terminal booking
  • Live job cost
  • Overrun alerts
Production module →

Aftersales and service jobs

Repairs, warranty and field work run as their own orders against the delivered equipment.

  • Service orders
  • Equipment history
  • Field task assignment
Services add-on →