← All news

6 Feb 2026

BHAG Digital at WAM Saudi 2026: BEEDIGIT and factory.online

BHAG Digital will present BEEDIGIT and factory.online — an AI-driven MES and a digital manufacturing management platform with real use cases and a live demo at WAM Saudi 2026.

BHAG Digital at WAM Saudi 2026: BEEDIGIT and factory.online

15–17 February 2026, Riyadh, Riyadh Front Exhibition & Conference Centre

International technology company BHAG Digital will participate in World Advanced Manufacturing & Logistics (WAM) Saudi 2026, where it will present its proprietary digital products BEEDIGIT and factory.online — practical solutions for managing modern manufacturing within the Industry 4.0 framework.

At the BHAG Digital booth, visitors will experience AI-driven MES and a digital factory management platform in action — with real production data, live analytics, and practical industrial use cases.

From Digital Vision to Measurable Results

BHAG Digital’s solutions focus not on concepts, but on tangible business impact for manufacturing. Implementing BEEDIGIT and factory.online enables companies to achieve:

Key performance outcomes:

  • 20–30% reduction in lead time
  • 15–30% reduction in inventory and production costs
  • 10–20% increase in OEE
  • 98–99% service level

All results are based on practical experience from real industrial implementations.

BEEDIGIT and factory.online — One Unified Digital Factory Ecosystem

‍BEEDIGIT is a Plug & Play, AI-driven MES / OEE solution delivering real-time manufacturing transparency — from machine data collection and OEE control to downtime, loss, and performance analysis, even on legacy equipment.

factory.online is a cloud-based platform that integrates key manufacturing and management processes into a single digital system: production planning, execution, material flow control, WIP tracking, and KPI analytics.

Together, BEEDIGIT and factory.online provide end-to-end digital factory management — from machines and operators to management and strategic decision-making.

Live MES & AI Demo at the BHAG Digital Booth

A key highlight of the booth will be the Live MES & AI Demo — a real-time demonstration of BEEDIGIT and factory.online in operation:

  • real-time production monitoring
  • downtime and performance analysis
  • OEE and key KPI tracking
  • data-driven manufacturing management instead of intuition

Proven Experience with Industrial Manufacturers

BHAG Digital solutions are used by manufacturing companies of various scales across the Middle East and beyond, including: alfanar, Ducab, Elsewedy Electric, ProCab, AslCab, Gulf Cables & Electrical Industries Group, Midal Cables, MuviQ, as well as other manufacturers in the cable, electrical, and related sectors.

Invitation to Dialogue

BHAG Digital invites factory owners, production managers, operations directors, CIOs, and CTOs to visit the company’s booth at WAM Saudi 2026 to:

  • discuss real manufacturing challenges
  • see MES and digital platforms live
  • evaluate the potential for fast ROI from digitalization

BHAG Digital BEEDIGIT | factory.online AI-driven MES · Digital Manufacturing · Industry 4.0 Real production. Real data. Real results.

Your factory deserves better than spreadsheets and guesswork