← All integrations

28 Aug 2026

A Unified Digital Ecosystem for Manufacturing Management

Modern manufacturers face daily challenges: data scattered across different systems, limited control over equipment, and process management still relying on outdated spreadsheets or fragmented solutions. The result is lost productivity, wasted energy, and reduced profitability.

A Unified Digital Ecosystem for Manufacturing Management

BEEDIGIT is a lightweight MES/OEE system that connects to any production equipment via a simple plug & play approach. It provides real-time monitoring of performance, energy consumption, and machine status, while automatically recording production output, scrap, downtime, and changeovers.

With BEEDIGIT, companies gain a clear view of their true OEE, uncover losses and hidden reserves, reduce unplanned stoppages, and increase throughput — all without capital investments. It delivers 24/7 transparency and control over your shop floor.

Combined with factory.online, BEEDIGIT creates a single digital control loop — from order planning to real-time machine execution.

What the Integration Delivers

Unified Digital Loop

All business processes — sales, purchasing, planning, inventory, production — are connected directly to machine data.

Result: no blind spots, full transparency, reliable execution.

Real-Time Operations

  • Monitor machine workload and productivity in real time
  • Automatic recording of task execution times, finished products, scrap, and material usage
  • Energy consumption tracking and efficiency loss detection

Plug & Play Simplicity

BEEDIGIT connects to any sensors or machines without complex integrations or costly modifications.

Transparent Batches & Inventory

Integration automatically links material and product batches with Job Orders. Every movement of materials or products is instantly reflected in the system.

Shopfloor Control

  • Production orders from factory.online are automatically sent to work centers via BEEDIGIT
  • Execution, downtime, changeovers, and scrap are tracked in real time
  • Data flows back into factory.online for analysis and decision-making

No Extra Systems Required

No need to implement separate MES or SCADA systems — everything runs seamlessly with factory.online, lowering TCO and accelerating ROI.

How It Works (Process Flow)

  1. Orders are created in factory.online
  2. Material and product batches are passed to the system
  3. Job Orders are distributed across work centers
  4. BEEDIGIT captures machine data: output, scrap, waste, energy consumption
  5. Results flow back into factory.online: inventory, order statuses, real-time execution

Key Benefits of Integration

For Owners & Top Management

  • End-to-end visibility: from order to delivery
  • Real-time control of performance and energy costs
  • Faster and more confident decision-making

For Production Managers

  • Automated recording of output, scrap, and waste
  • Less manual work — more trusted machine data
  • Full control of Job Orders and resources

For Economists & Financial Analysts

  • Actual production times integrated into cost accounting
  • Comparison of planned vs. actual performance
  • More accurate financial and operational insights

For Engineers & Supervisors

  • Simple equipment connectivity, no complex projects
  • Instant alerts on downtime, failures, or energy anomalies
  • Practical tools to improve efficiency at each work center

In Summary

The integration of factory.online + BEEDIGIT is the path to Smart Manufacturing, where planning, control, and execution are connected into a single ecosystem.

You gain:

  • Transparent accounting
  • Realistic, adaptive plans
  • Data that drives profitability and reduces losses

Your production GPS: from order to finished product.

Your factory deserves better than spreadsheets and guesswork