← All news

15 Oct 2025

Smart Cable Manufacturing - Collaboration Highlights from Wire & Cable Poland 2025

At Wire & Cable Poland 2025, leading innovators showcased how AI, MES, and real-time planning are transforming cable manufacturing. Discover how factory.online and www.beedigit.com connects machines, planning, and data for next-gen production.

Smart Cable Manufacturing - Collaboration Highlights from Wire & Cable Poland 2025

At Wire & Cable Poland 2025, BHAG Digital took part in the Nonferrous Track, joining leading innovators in wire drawing, MES, automation, and AI-driven inspection. The message was clear: the future of cable manufacturing is smarter, more connected, and data-driven.

One of the most rewarding parts of the event was our conversations with top machine manufacturers who share our vision of intelligent production:

  • NIEHOFF — aligning digital service strategy with shopfloor execution and planning
  • SAMP — exploring integration between planning modules and machine feedback
  • PS Costruzioni Meccaniche — enabling better planning of rewinding and packaging lines
  • EURODRAW — supporting flexible production planning through accurate feedback
  • BETASISTEMI — synchronizing quality control automation with production planning
  • LÄMNEÅ — improving lead time prediction through digital work order tracking
  • CONTINUUS PROPERZI — modeling continuous processes in multi-scenario APS engine

Our factory.online platform becomes a natural digital layer for:

  • Planning cable production and packaging with real-time constraints
  • Managing semi-finished WIP and demand planning for long runs

BEEDIGIT for:

  • Fast machine-to-MES connectivity to boost OEE
  • Enable continuous quality control and smart inspections
  • Predictive tools management
  • Deliver digital job orders for truly paperless manufacturing.

We’re excited to help these manufacturers not just run production, but optimize it — using real data and dynamic planning.

‍

Ready to explore how we can sync your machines and planning together? ‍

Visit: www.factory.online | www.beedigit.com

Your factory deserves better than spreadsheets and guesswork